Allington Lock and Slipway
Gateway to the rural River Medway
Home
Information for all boaters and canoeists
How to find us
Contact Us
Photos and other useful information
New dredger
New Shower Block At Yalding
Teston Lock Refurbishment
Tonbridge Lock and Oak Weir Lock Canoe and Fish Passes
Eldridges Lock Refurbishment
Eldridges Lock Canoe Fishway 2009/10
Replacement of Teston Lock Landing Stages 2009/10
Replacement of East Farleigh Lock Landing Stages 2009/10
East Lock Canoe and Fish Pass
Refurbishment of Allington Sluice
Rye Slipway Jetty
Reconstruction of Hampstead Lock 2009
Improvements for boaters 2009
Porters Lock Canoe Fishway 2008/09
River improvements 2006-2008
Photos - Allington
Photos - Medway general
Useful Links
New dredger

Below are drawings and photographs showing progress of the bespoke designed new tug "Mallard" and dredger barge "Teal" that have been built built for the Environment Agency. The vessels are based on an original Canal and River Trust design. The design detailing was provided by Keel Marine of Petersfield and has been built by Manor Marine of Portland, Dorset. Total project costs around £450k.
The two vessels will aid the navigation team on the Medway in their annual dredging & channel maintenance programme. The multi purpose barge will also provide lifting capabilities for dam boards and other materials. The two vessels are road transportable so can be delivered to other watercourses when required.


Yalding - 12th May 2015:

































Previous drawings and build photographs:


Tug boat


Dredger/ multi purpose barge



Dec 2014 - Hull of the tug - (upside down)



December - Tug upside down


December - Tug Upside down



Jan 2015 - Overview of tug and multi purpose barge (grey coloured box on the right hand side)


Jan 2015 - Tug boat - hull 80% complete


Jan 2015 - Tug boat


Jan 2015 - Multi purpose barge - port side


Jan 2015 - Multi Purpose barge - inside the hold


Jan 2015 - Multi purpose barge - Looking at stern of barge (stern not installed)



Feb 2015 - Tug Hull 95% complete (pushing knees on the bow)


Feb 2015 - Tug Hull 95% complete


Feb 2015 - Power pack for the barge


Feb 2015 - Stern of the barge


Feb 2015 - Port side (without decking) of the barge


Feb 2015 - Wheelhouse


Feb 2015 - Front of Wheelhouse


Early March 2015 - tug overview



Early March 2015 - tug stern



Early March 2015 - barge bowthruster port



Early March 2015 - barge crane deck



Early March 2015 - barge stern



Mid March - Barge overview



Mid March tug be fitted out before painting


Mid March - Tug Wheelhouse complete and ready to fit


Mid March - inside tug wheelhouse


Mid March - hydraulic drive being fitted.